[Date Prev][Date Next][Thread Prev][Thread Next][Date Index][Thread Index]

Re: for CD-2 (fwd)



Hi Elke,

We can look into this some more.

Tim

Elke-Caroline Aschenauer wrote:
Dear Matt,

thanks for the answer. okay so things are exactly how I thought they are.
As I said we have a ME job offer out, but the problem is there are 10 or
more out from JLAB, but it seems nearly impossible to get canidates.
We have to look into this in more detail. But that is to late for the
costbook update, I'm afraid we are in for a suprise there in cost, but we
will find out. For the moment we need some rough drawings. Tim, do you see
a chance to do something on it?

bye elke


 ( `,_' )+=-+=-+=-+=-+=-+=-+=-+=-+=-+=-+=-+=-+=-+=-+=-+=-+=
  )    `\                                                  -
 /    '. |                                                  +
 |       `,              Elke-Caroline Aschenauer            =
  \,_  `-/                                                    -
  ,&&&&&V         Jefferson Lab                                +
 ,&&&&&&&&:       HALL-D 12C / F381       121-A Atlantic Avenue =
,&&&&&&&&&&;      Mailstop: 12H5          Hampton, VA 23664      -
|  |&&&&&&&;\     12000 Jefferson Ave                             +
|  |       :_) _  Newport News, VA 23606  Tel.:  001-757-224-1216  =
|  |       ;--' | Mail:  elke@jlab.org    Mobil: 001-757-256-5224   -
'--'   `-.--.   |                                                    +
   \_    |  |---' Tel.:  001-757-269-5352                             =
     `-._\__/     Fax.:  001-757-269-6248                              -
            +=-+=-+=-+=-+=-+=-+=-+=-+=-+=-+=-+=-+=-+=-+=-+=-+=-+=-+=-+=-+

---------- Forwarded message ----------
Date: Thu, 12 Apr 2007 23:37:04 -0400
From: Matthew Shepherd <mashephe@indiana.edu>
To: Elke-Caroline Aschenauer <elke@jlab.org>
Subject: Re: for CD-2


Hi Elke,

I will need to check with Eric Scott (former IU tech who prepared the
spreadsheets I sent you).  My impression is that there are only
drawings for the cell wall to hold the PMTs.  While the sheets I sent
appear quite detailed, I believe this was done by Eric probably
simply making a list of items from experience with RadPhi and also
E852.  I have never seen a drawing the GlueX FCAL darkroom or glass
support structure.

It is true that there was talk of producing the cell wall in
Protvino.  However, when we talked with Sergey about this, he said
the shop there could not machine parts to the tolerances needed.  We
assumed then that the cell wall would be constructed at IU with
outside contractors doing some of the machine work.  However, no
quotes have been secured for this work.  I can however provide some
preliminary drawings for the cell wall.

I agree these are critical items.  I tried to stress this in my
collaboration meeting talk that we need to come up with designs for
the glass support structure so it can be appropriately costed.  There
are also mechanical issues there related to filling in/shimming the
corners so one has a nice gap-free circular stack of glass.  It sure
looks like from the read of the budget that JLab intended to play
some role in the design of the glass support structure.  There is
$100K in PED budgeted for what looks like engineering/design for the
cell wall and glass support structure.  Do you have engineering
manpower available at the lab to help design this?

-Matt


On Apr 12, 2007, at 5:25 PM, Elke-Caroline Aschenauer wrote:

  
Dear Matt,

I have 2 questions just to make sure we have everything clear for
the CD-2
preparations.

There are 4 big construction items in the FCAL, the cellular
structure to
hold the PMTs, the structure for the Pb-glas blocks and the "dark-
room"
for the FCAL and the overall structure to support everything.

The design for the overall support structure is done here at JLAB,
I remember that the cellular structure to old the PMTs was supposed
to be
produced in Protvino, what about the structure to hold the Pb-glas
blocks
and the "dark-room".

We need actually drawings of all of these items, can you or maybe
Sergey provide them.
One more question are the cost estimates for this items based on
drawings send to a vendor?

Thanks elke



 ( `,_' )+=-+=-+=-+=-+=-+=-+=-+=-+=-+=-+=-+=-+=-+=-+=-+=-+=
  )    `\                                                  -
 /    '. |                                                  +
 |       `,              Elke-Caroline Aschenauer            =
  \,_  `-/                                                    -
  ,&&&&&V         Jefferson Lab                                +
 ,&&&&&&&&:       HALL-D 12C / F381       121-A Atlantic Avenue =
,&&&&&&&&&&;      Mailstop: 12H5          Hampton, VA 23664      -
|  |&&&&&&&;\     12000 Jefferson Ave                             +
|  |       :_) _  Newport News, VA 23606  Tel.:  001-757-224-1216  =
|  |       ;--' | Mail:  elke@jlab.org    Mobil: 001-757-256-5224   -
'--'   `-.--.   |                                                    +
   \_    |  |---' Tel.:
001-757-269-5352                             =
     `-._\__/     Fax.:
001-757-269-6248                              -
            +=-+=-+=-+=-+=-+=-+=-+=-+=-+=-+=-+=-+=-+=-+=-+=-+=-+=-
+=-+=-+