Hi Zisis and George,
Attached are the most recent preliminary drawings showing the wedges and
assy. The datums and tolerances need to be worked on a bit. I believe we
could start with a tolerance of .010 inches for each dimension and
change from there if needed. I will send you another update by the end
of the week. Please have your shop look at these to see if they can
machine them. One of the questions would be "Do we machine the aluminum
first, then layup scifi/lead, then machine the lead? Note there are 3
different aluminum strong backs depending on position.
Cheers,
Tim<D00000-01-07-1004.pdf><D00000-01-07-1001.pdf><D00000-01-07-1002.pdf><D00000-01-07-1003.pdf>