[Date Prev][Date Next][Thread Prev][Thread Next][Date Index][Thread Index]
notes Meeting Wed Mar 13
Meeting Wed Mar 13
====================
Notes by Elton.
Present: Brian Kross, Carl Zorn, Elliott, Elton, Stan Majewski, Fernando,
Dave, Steve, Paul, Ravi Anumagalla, James, Ed.
A lot of good progress was reported today.
Forward Tracking (Detector Group)
=================================
Materials
---------
- Material thickness
- Self-supporting structure
- Use wires as cathodes?
Area Around Beam:
----------------
- Active Beam Killer
- Change HV on cathode to reduce gradient near wire
- thickening wire in that region
- Passive Deadining
- Glue mylar to wires
Preamplifiers
------------
- Work with Fernando
Choice of Gases
---------------
Trigger Simulation (James and Dave)
===================================
Simulated 2 background channels, 3 signal channels
Background p pi0
----------------
- 10% conversion of photons in tof or start
- Energy deposition in calorimeters < 0.3 GeV
n pi+
-----
- 20% 2 tracks
- neutron conversion?
Signal pi+ eta n
----------------
- Ecal > 1 GeV
- Split between 1 and 2 tracks
rho p
-----
- Ecal > 0.5 GeV
- track count 3, 4, 5
X(1600) p--> pi rho p
----------------------
- Ecal > 0.5 GeV
- track count few 3/ split 4 and 5
Detector Simulation (Ravi)
==========================
- Support structure for magnet design
Integration of detector elements into model
- Cerenkov model by Gary's student
- Pb glass model by Eric Scott
- Other detector shapes from DR
Next Step:
- Develop exploded view of detectors to show support structures
- Start building realism into geometry and establish keep out zones
Electronics (Ed and Fernando)
=============================
- Board is complete except for division of some power planes
- Checking in progress
- 12 layer board with controlled impedance
5 are reference places
Board can be shipped out in 1-2 weeks.
---------------------
--
Elton Smith
Jefferson Lab
elton@jlab.org
(757) 269-7625