HallD Meeting minutes
Hi All,
Here are some minutes from this morning's meeting.
-Dave
-----------------------------------------------------------------------
Attendees: Elton S., Ravi A., Dave D. David L., Paul B., Ben W., Ed B.
ES: Collaboration meeting report. MOU's - JLab MOU needs to have
a lot of care to be as accurate as reasonably possible.
EB: Calorimeter can be made 2/month which means 2 years for fabrication.
Not really room to store them all though.
PB: More motivation for hall construction.
ES: Building not expected to be ready until the end of 2007.
EB: The 2 year schedule is based on completely smooth operation for
2 years. 3 years are more realistic.
Prototype to be constructed this summer and then tested at Serpukov.
2005 is earliest to expect real production on BCAL.
ES: I'll circulate schedules for people to review.
DD: What was the decision on how central detectors will be inserted
(one end or both ends)? Answer- both ends.
PB: Two magnet tagger got little resistance at meeting.
ES: Some concerns were raised in smaller meeting. Concerns
about the vacuum box. How to support it between two magnets.
PB: That's easy.
DD: What is expected (construction) completion date?
ES: Not well know. Based on optimistic estimates, 2008.
DD: May be hard to get all funding in just a 3 year period.
EB: May be lucky to get CD1 a year from now. Construction can't start
until 2006.
ES: CD1 doesn't give money for construction so construction can't
occur in 2006 (unless SURA loans the money up front.)
PB: Any commitment to taking over Cherenkov design.
ES: Collaborators from UTenn have expressed serious interest.
EB: We have post-doc who can start working on simulations. He has
some experience with PID.
--- More discussion on tagger magnet ---
PB: Schedule for (solenoid) magnet: Jan 2006 start moving components
into test area at JLab. Ends Dec. 2007
EB: Schedule seems really long. (First BCAL module can't be installed
until jan 2008.)
ES: Looks like we need space at JLab in Aug. 2005 according to this
schedule.
--- More discussion on details of solenoid schedule ---
EB: At very least 9 months will be needed for BCAL (w/ electronics)
installation.
ES: JLab MOU - We need to review the personel listed and the fraction
of FTE time. Can be obtained from Curtis's website.
--- Discussion of manpower. DAQ group should maybe come up with
a list of milestones in CODA development.---
ES: Need to finalize who will be responsible for FADC project.
ES: What do we do next week?
10:17 adjorn
------------------------------------------------------------------------