Dear collaborators,

The resource-loaded schedule which is being prepared for the Mini-review
in December is matched to the cost book.  Revisions are planned early next
year in preparation for the CD-2 review. In order to prepare for revisions
of the schedule with the latest costs and resource requirements, we have
made a list of persons that should review the existing resource estimates
in the cost book and a scrutineer to look over the costs. If anyone would
like to volunteer for the open slots let me know. The initial review is
due on Dec 15.  We will schedule scrutineers when the initial review is
complete.

Review the list of activities, cost, manpower needes, duration, and how
the activities are linked together. The excel sheets with the current
information is on the portal, and hard copies from the official P3e
schedule were distributed at the meeting.

Let me know if there are any questions. Cheers, Elton.


WBS        id              reviewer    scrutineer

1.5.1      Solenoid        Paul B.
1.5.2.1.1  FDC             Dan         Curtis
1.5.2.1.2  CDC             Curtis      Dan
1.5.2.1.3  Start           Werner
1.5.2.2.1  Bcal            George      Carl
1.5.2.2.2  Fcal            Matt        Paul E.
1.5.2.2.3  UPV             Paul        Zisis
1.5.2.3.1  TOF             Matt        Richard
1.5.2.3.2  Cer             Alex        George
1.5.3.1    DAQ             Elliott     Tim
1.5.3.2    Online          Elliott     Mark
1.5.3.3    Offline         David L.    Tim
1.5.4.1    FADC            Chris       Lars
1.5.4.2    FDC             Chris       Lars
1.5.4.3    Trigger         David D.    Lars
1.5.4.4    Crates/racks    Chris       Lars
1.5.4.5    Logic, HV       Chris       Lars
1.5.5.1.1  Tag magnet      Jim K.      Dan
1.5.5.1.2  Tag hodos       Richard     Dan
1.5.5.2    Target          Mike S.
1.5.5.3    Bealine         Richard     Arne
1.5.6.1    Assembly        Elton
1.5.6.2    Installation    Elton
1.5.6.3    Cryogenics      Paul B.

Elton Smith
Jefferson Lab
elton@jlab.org
(757) 269-7625

_______________________________________________
GlueX mailing list
GlueX@dustbunny.physics.indiana.edu
http://dustbunny.physics.indiana.edu/mailman/listinfo/gluex