[Date Prev][Date Next][Thread Prev][Thread Next][Date Index][Thread Index]
todays meeting
Dear all,
I was wondering we could discuss the following points in our meeting
today.
1. Magnet
-- repair status
-- status of vacuum checks, what do we the leaking coil
-- status of Floyds ansys calculations
2. preparations for system review
http://www.jlab.org/Hall-D/reviews/System_Review_May08/Pre-Brief_Materials/
I put all the pre-brief material in the place above.
I used the new and 355 drawings depending what I had.
Do I get new drawings for the platforms, till now I have only the old
ones from CD3
Are there some other new drawings. The gassystems are in the cdc and
fdc directory
3. How are we doing with all the other things we started for this system
review power consumptions and so on? I want to get an update on this as
well
4. everything else which needs to be discussed
new designer for tagger
( `,_' )+=-+=-+=-+=-+=-+=-+=-+=-+=-+=-+=-+=-+=-+=-+=-+=-+=
) `\ -
/ '. | +
| `, Elke-Caroline Aschenauer =
\,_ `-/ -
,&&&&&V Jefferson Lab +
,&&&&&&&&: HALL-D 12C / F381 121-A Atlantic Avenue =
,&&&&&&&&&&; Suite 8 Hampton, VA 23664 -
| |&&&&&&&;\ 12000 Jefferson Ave +
| | :_) _ Newport News, VA 23606 Tel.: 001-757-224-1216 =
| | ;--' | Mail: elke@jlab.org Mobil: 001-757-256-5224 -
'--' `-.--. | +
\_ | |---' Tel.: 001-757-269-5352 =
`-._\__/ Fax.: 001-757-269-6331 -
+=-+=-+=-+=-+=-+=-+=-+=-+=-+=-+=-+=-+=-+=-+=-+=-+=-+=-+=-+=-+