[Date Prev][Date Next][Thread Prev][Thread Next][Date Index][Thread Index]

installation review




Dear all,

I have prepared a review www page for the installation review @ 18th of
february.

Please go to the section labled Pre Brief Material.

I have linked the drawings Tim or ? please have look I have always the
latest and best vertsion. I used for al lthe drawings despite the tagger
and beam line the ones from the CD3 drawing package.

I have started to link schedules, not all are there yet. Please give me
some feedback on what is the plan on the individual ones. and place the
latest versions in M:\halld\Individual-Schedules in the respective
directory so I can make pdf files out of them.

Do we have anythink  on the magnet we coudl give as prebrief material.
Now Elton you had some ideas about infor on grounding and so on, which
document/talk did you have in mind.

Anything else which is missing.

thanks elke

 ( `,_' )+=-+=-+=-+=-+=-+=-+=-+=-+=-+=-+=-+=-+=-+=-+=-+=-+=
  )    `\                                                  -
 /    '. |                                                  +
 |       `,              Elke-Caroline Aschenauer            =
  \,_  `-/                                                    -
  ,&&&&&V         Jefferson Lab                                +
 ,&&&&&&&&:       HALL-D 12C / F381       121-A Atlantic Avenue =
,&&&&&&&&&&;      Suite 8                 Hampton, VA 23664      -
|  |&&&&&&&;\     12000 Jefferson Ave                             +
|  |       :_) _  Newport News, VA 23606  Tel.:  001-757-224-1216  =
|  |       ;--' | Mail:  elke@jlab.org    Mobil: 001-757-256-5224   -
'--'   `-.--.   |                                                    +
   \_    |  |---' Tel.:  001-757-269-5352                             =
     `-._\__/     Fax.:  001-757-269-6331                              -
            +=-+=-+=-+=-+=-+=-+=-+=-+=-+=-+=-+=-+=-+=-+=-+=-+=-+=-+=-+=-+