User-Agent: Mozilla/5.0 (Windows; U; Windows NT 5.1; en-US; rv:1.7.6) Gecko/20050319
Dear Colleagues,
The attachment contains the last cost and schedule estimate. ~3%
increase of the total cost is mainly due to the change in the magnet
design (clamps, etc).
Best regards.
Sergey.