Re: Tagger interface drawing
Tim,
thanks for producing the drawing - without the placement of the tagger
package in the hall it's really difficult to imagine the real estate.
I have 2 concerns (we can discuss that tomorrow):
a) exit beam pipe (like in Yang's and my files) has still a flange and
comparatively small pipe (2 1/2"). Let's see whether we can get an oval or
rectangular form (as proposed in the SoW);
b) in the SoW I asked for downstream extension of the vacuum chamber to
prevent backscatterer into the tagger counters.
I have to admit that I haven't touched the (preliminary) 3D model any more
for 7 months; I should have made the changes there ...
Let's talk tomorrow
Franz
ps. Can I borrow a detailed civil drawing of the collimator cave for 2-3
weeks?
On Wed, 9 Jan 2008, Tim Whitlatch wrote:
> Hello all,
>
> I have placed the tagger interface drawing on the wiki under
> Engineering. Please look it over and let me know if there are any
> corrections, comments deletions etc. Then we can distribute it to the
> bidders on the contract.
>
> Best Regards,
>
> Tim
>
===============================================================
Franz J. Klein, Associate Professor
CUA, Department of Physics
Washington, DC 20064
office: Hannan Hall 210 phone: 202-319-6190
or: Jefferson Lab,CC F-243 phone: 757-269-6671
---------------------------------------------------------------