[Date Prev][Date Next][Thread Prev][Thread Next][Date Index][Thread Index]

Re: Updated tagger interface drawings



Also, yes the date did not change on the dwg even though it is the 
latest. We will make sure there is a new date on the face of the dwg for 
subsequent postings.

Tim

Alexander Somov wrote:
> Hi Tim,
> Is the latest version Jan 21 2009 ?
> It seems that the quadrupole magnet is not moved (?)
>
> I've revisited calculation of the magnets shift due
> to the new magnetic field map. I came up with the shift
> of 19.22 cm rather than 19.6 cm (the later was just an
> estimate).
>
> Thanks,
>        Sascha
>
>
> On Tue, 10 Feb 2009, Tim Whitlatch wrote:
>
>> All,
>>
>> The tagger critical interface drawings have been updated on the wiki @
>> http://www.jlab.org/Hall-D/software/wiki/index.php/Tagged_Beam_Group_Engineering_Drawings 
>>
>>
>> Please have a look to make sure we are all in agreement before we 
>> pass this info on to the accelerator group.
>>
>> Thanks,
>>
>>      Tim
>>
>>