Re: review



Hi Elke,

For the presentation and besides the drift chamber electronics, what 
other systems should I include? Start Counter, TOF, BCAL?
These are easy to include - not a major effort.

Regards,
Fernando

Elke-Caroline Aschenauer wrote:
> Dear all,
>
> I know that lately things are a " bit " busy, but we have our drift
> chamber & PID review coming up.
>
> I was wondering we should not use the opportunity that a lot of us are at
> one place and meet today either after the last discussion session or
> tomorrow after the Closeout.
>
> There have been quite some pre-brief material been posted on the portal
>
> 990-v4 	The GlueX Central Drift Chamber
> 754-v5 	Forward Drift Chamber Technical Design Report
> 994-v1 	TOF detector description for CDR
>
> and Alex posted a nice summary on kinematics
> 838-v3 	A Summary of Kinematics Relevant to the GlueX Experiment
>
> I think it would be a good idea if the FDC group would scrutinize the CDC
> documents and visa versa.
>
> On the electronics there is also already a lot
> 967-v3 	High Voltage Distribution for the Hall D CDC and FDC Detectors
> 966-v2 	Low Voltage Distribution for the Hall D CDC and FDC Detectors
> 855-v2 	Specification Document for FDC/CDC ADC
> 995-v2 	Cable Characteristics for the Hall D FDC and CDC Detectors
> we have of course also documents on the F1TDC.
> I think what is missing is a summary on the ASIC, but I'm sure Mitch and
> Fernando are working on it.
>
> For the tracking Dave started to write something.
> Dave how far are we to have a consistent set of plots on tracking using
> only the new geometry.
> I really think we should show only plots from one geometry, everything
> else is slightly confusing.
>
> Additional info: 992-v2 	Start Counter Update
>
> The one worry I have is what we have on the overall PID performance of the
> detector. I think we really have to concentrate on this the next 2 weeks.
>
> Just as a courtesy reminder, the absolute latest the pre-brief material has
> to go out is Friday the 21st noon.
>
> Most what I listed can be found from.
> http://www.jlab.org/Hall-D/software/wiki/index.php/DC_and_PID_Review
>
> Cheers elke
>
>  ( `,_' )+=-+=-+=-+=-+=-+=-+=-+=-+=-+=-+=-+=-+=-+=-+=-+=-+=
>   )    `\                                                  -
>  /    '. |                                                  +
>  |       `,              Elke-Caroline Aschenauer            =
>   \,_  `-/                                                    -
>   ,&&&&&V         Jefferson Lab                                +
>  ,&&&&&&&&:       HALL-D 12C / F381       121-A Atlantic Avenue =
> ,&&&&&&&&&&;      Suite 8                 Hampton, VA 23664      -
> |  |&&&&&&&;\     12000 Jefferson Ave                             +
> |  |       :_) _  Newport News, VA 23606  Tel.:  001-757-224-1216  =
> |  |       ;--' | Mail:  elke@jlab.org    Mobil: 001-757-256-5224   -
> '--'   `-.--.   |                                                    +
>    \_    |  |---' Tel.:  001-757-269-5352                             =
>      `-._\__/     Fax.:  001-757-269-6331                              -
>             +=-+=-+=-+=-+=-+=-+=-+=-+=-+=-+=-+=-+=-+=-+=-+=-+=-+=-+=-+=-+
>   
begin:vcard
fn:Fernando J. Barbosa
n:Barbosa;Fernando J.
org:Jefferson Lab
adr:Suite #10, 12B3;;12000 Jefferson Ave.;Newport News;VA;23606;USA
tel;work:757-269-7433
version:2.1
end:vcard