[Date Prev][Date Next][Thread Prev][Thread Next][Date Index][Thread Index]
Next FDC Group Meeting
Folks,
Our next FDC group meeting is scheduled for tomorrow afternoon at
1:30 p.m in F228. The agenda is below. Let me know if there is
anything else to add to the list.
Regards,
Daniel
*****************************************************************
FDC Weekly Meeting Agenda
Mar. 20, 2008
-----------------------------
1. Full-scale prototype update.
- procurement update
- 2nd construction station
- cathode daughter boards
- contact with Sheldahl (update)
- contact with CCT (update)
- what to do about cathode procurement??
- deliveries
- plans for mass production/construction start
- 0.5 micron Cu, 50 micron Kapton spec
- long term cathode board storage system
- clean room tent occupancy date -- need for additional clean room space?
- stack assembly procedures
2. Wire winding planning.
- electroplating tests
- epoxy sample
- drawing/info to reflect where plane support can be attached
- update from IUCF
- wire specification document (W,CuBe)
3. Composite cathode prototype construction update.
- sandwich completion
- gas port attachment
- sealing of Rohacell
4. Ground connection scheme.
- Overview writeup (Fernando)
5. Gas volume definition.
- impedance/flow calculation results (Dave Meekings)
- definitions of holes in cathodes and foam
- can/should holes in cathode boards be made by board house?
6. Cathode board discussion.
- contact with board house:
- flatness specs and handling requirements
- cathode defects document
- minimum copper thickness
- QA procedures for boards at board house
- document for QA/stuffing/cleaning cathodes (Roger)
- document for QA/stuffing/cleaning cathode daughter boards (Roger)
7. Cathode daughter board update.
- final design status
- 10th cathode daughter/ground board status and placement
- rigid flex test solder update
8. STB/HVTB design update.
- document for QA procedures of boards upon delivery (Kim)
- document/instruction for board stuffing (Kim)
- modifications to construction jig for component clearance
9. Plans for cathode flatness measurements.
- discussion of plans for measurements in N.C.
- decision on developing/procuring system at JLab
- programming issues
10. Small scale prototype work.
- resolution/noise measurements with new preamp daughter boards status
- status of +/-75 deg cathode mounting (lessons learned)
- discussion of electrical test plan
11. Cooling system test update.
12. Planning for March DC review.
- TDR update
- Design drawings on web
**********************************************************************
**********************************************************************
* *
* Dr. Daniel S. Carman e-mail : carman@jlab.org *
* Staff Scientist office : (757)-269-5586 *
* Jefferson Laboratory web: www.jlab.org/~carman *
* *
**********************************************************************