FDC Weekly Meeting Agenda
September 4, 2008
-----------------------------
1. Full-scale prototype update.
- clean room preparations
- cleaning of space
- procuring gear
- procedures document
- meeting at clean room to practice/review
- sharing with HD-Ice?
- procurements:
- plans for rigid flex assembly order
- order for sense and field wire
- wire specification document
- Update on FDC prototype spreadsheet
- spacer frame
- material selection
- prototype construction
- gluing to cathode + directionality issues
- back to 2 o-rings???
- cooling system test report
- update on HV connections to packages
2. Wire frame update.
- update from IUCF on Phase 1 winding
- budget update
- wire frame construction:
- wire frame modification update
- plans for new load test
- construction procedure document(Bill/Brian)
- readiness for frame construction
- A frame loan agreement
- submission of wire frame work list
- work to move STB caps radially inward (D=1020 mm)
- document/instruction for board stuffing + cleaning
3. Cathode construction update.
- cathode update:
- plans for handling cathode boards
- SEM study of sample board
- schedule for delivery of boards
- flatness measurement system:
- update and time line for assembly
- schedule for Micah
- review of Eugene's document
- how to measure tension (which approach)
- hole cutting procedures (when and how)
- update on cutting cathode edges
- ground connections to cathode
- ground plane attachment status
- construction procedure document/outline
- cathode tension:
- in situ measurements
- R&D schedule for cathodes (now posted)
- document for QA/stuffing/cleaning cathodes
- document for QA/stuffing/cleaning cathode daughter boards
4. Small-scale prototype test update.
- ASIC studies writeup
- update on x/y plots with 2 um cathodes and pulser calibrations.
- resolution measurements
5. Design of gas handling system.
**********************************************************************
**********************************************************************
* *