[Date Prev][Date Next][Thread Prev][Thread Next][Date Index][Thread Index]
FDC Meeting
Folks,
The next FDC meeting is scheduled for tomorrow at 1:30 p.m. in F228
(note different room). The agenda is given below.
NOTE: Please give updates to Chuck Hutton on the cathode R&D work.
Regards,
Daniel
**********************************************************************
FDC Weekly Meeting Agenda
May 14, 2009
-----------------------------
1. Full-scale prototype preparations
- cathode storage space
- procurements/preparations for construction
- epoxy purchase
- pins for construction jig
- o-ring material order
- cathode frame flatness supports
- finalizing requirements for addressing resistors
- mechanical frame prototype work
- clean tent schedule planning
- cooling loop bending system
2. Wire frame update
- update from IUCF
- van reservation
- Mark's trip to IUCF for frames
- mask measurement
- measurements from P4, P1, P3 frames
- update of construction document
- wire electroplating procedures
- non-uniformity of rigid-flex assembly clearance slots?
- test fit of wire frame protective cover + platter schedule
3. Cathode frame update
- R&D schedule review
- cathode construction document
- frame machining status
- measuring 5 um cathode flatness
- better cathode frame clamping scheme
- cathode board order update
- cathode packing instructions
- update on delivery
- rigid flex assembly order update
- delivery status
- component soldering on rigid-flex assemblies
- rigid flex assembly solder tests
- purchase of 2 micron board material for production
- quote status
- order time line
- document for QA/soldering/cleaning cathodes
- document for QA/stuffing/cleaning cathode daughter boards
4. Miscellaneous
- LV, HV, signal cable update
- cooling system test report
- HV connections to packages
- sense and field wire testing
- mass spectroscopy
- QA test document
- machining of preamp card cooling loop clamp assemblies
- remaining FDC system design work
- FDC construction location (Hampton clean room, EEL126?)
5. Prototype tests
- small-scale prototype resolution study update
- update on reorganization of EEL 126
- update on cosmic ray stand movement
- test plan for full-scale prototype
**********************************************************************
**********************************************************************
* *
* Dr. Daniel S. Carman e-mail : carman@jlab.org *
* Staff Scientist office : (757)-269-5586 *
* Jefferson Laboratory web: www.jlab.org/~carman *
* *
**********************************************************************