FDC Weekly Meeting Agenda
May 14, 2009
-----------------------------
1. Full-scale prototype preparations
     - cathode storage space
     - procurements/preparations for construction
        - epoxy purchase
        - pins for construction jig
        - o-ring material order
        - cathode frame flatness supports
     - finalizing requirements for addressing resistors
     - mechanical frame prototype work
     - clean tent schedule planning
     - cooling loop bending system
2. Wire frame update
     - update from IUCF
        - van reservation
        - Mark's trip to IUCF for frames
        - mask measurement
        - measurements from P4, P1, P3 frames
     - update of construction document
        - wire electroplating procedures
     - non-uniformity of rigid-flex assembly clearance slots?
     - test fit of wire frame protective cover + platter schedule
3. Cathode frame update
     - R&D schedule review
     - cathode construction document
     - frame machining status
     - measuring 5 um cathode flatness
        - better cathode frame clamping scheme
     - cathode board order update
        - cathode packing instructions
        - update on delivery
     - rigid flex assembly order update
        - delivery status
        - component soldering on rigid-flex assemblies
     - rigid flex assembly solder tests
     - purchase of 2 micron board material for production
        - quote status
        - order time line
     - document for QA/soldering/cleaning cathodes
     - document for QA/stuffing/cleaning cathode daughter boards
4. Miscellaneous
     - LV, HV, signal cable update
     - cooling system test report
     - HV connections to packages
     - sense and field wire testing
        - mass spectroscopy
        - QA test document
     - machining of preamp card cooling loop clamp assemblies
     - remaining FDC system design work
     - FDC construction location (Hampton clean room, EEL126?)
5. Prototype tests
     - small-scale prototype resolution study update
     - update on reorganization of EEL 126
     - update on cosmic ray stand movement
     - test plan for full-scale prototype
**********************************************************************
**********************************************************************
*                                                                    *
* Dr. Daniel S. Carman                   e-mail : carman@jlab.org    *
* Staff Scientist                        office : (757)-269-5586     *
* Jefferson Laboratory                   web: www.jlab.org/~carman   *
*                                                                    *
**********************************************************************