[Date Prev][Date Next][Thread Prev][Thread Next][Date Index][Thread Index]
Changes to FDC XML definition
Hello, everyone.
I've made several significant changes to the XML definition for the FDC
to make the description conform
better to the current engineering drawings. A svn log message
describing the changes is appended below. I have also moved the FDCs
closer to the CDC (for this you will need an updated version of the
main_HDDS.xml file). In order to use the new geometry you will have to
update hitFDC.c in programs/Simulation/HDGeant and the
lorentz_deflections file in calib/FDC. Note that the
lorentz_deflections file is consistent with the new position of the FDC
with respect to the CDC and is not guaranteed to give sensible results
for significant changes in the position of the packages.
Some parameters, such as the actual distance between the cdc and the fdc
and the package-to-package spacing still need to be optimized.
Simon
------------------------------------------------------------------------
r5183 | staylor | 2009-05-15 15:08:42 -0400 (Fri, 15 May 2009) | 1 line
First version of new geometry for the FDC. The chambers are no longer
grouped in modules of three; the new unit is a single chamber, so in
principle all of the rotation angles of the chambers for a package can
be different or a chamber could be removed from a package. The wire
plane-to-wire plane separation within a packages was reduced from 3cm to
2cm. The 2mm foam in the active area has been removed and the thickness
of the ground plane has been reduced. The package-to-package support
shell has been changed from aluminum to FR-4 and the support rods are
now also FR4. The compression rods are now Ultem-2300 and gusset rings
for the compression of the o-rings have been added. A ring for
supporting the cables on the upstream side of the FDC has been added.
The spacer ring between the wire plane and one of the cathode planes in
a chamber is now polypropylene instead of a composite. The other
support structures are now more consistent with the current engineering
design. The chamber gas now fills the entire interior package volume
instead of just the 1 cm active region of each chamber. The epoxy in
the cathode material has been removed from the active region.
------------------------------------------------------------------------