FDC Weekly Meeting Agenda
July 2, 2009
-----------------------------
1. Full-scale prototype preparations
- status of construction jig
- fixture for support/rotation of full-scale prototype
- modifications to tensioning fixture
2. Wire frame update
- soldering problems with wire frames
- update on checking/repairs
- schedule
- Phase 3 planning
- dealing with flatness issues
- design of combs
- new strongback design
- other facility modifications
- final circuit board design
- time table for construction
- update of construction document
- wire electroplating procedures
3. Cathode frame update
- cathode frame gas sealing
- cathode flatness measurement status
- granite table baseline
- cathode construction updates
- board layup
- problems with existing cathodes
- procedure issues
- handling guidelines
- tension settings for 5 um and 2 um boards
- cathode board construction update
- short term storage plans (inert environment)
- rigid flex assembly component soldering
- PR for 2-um board material for production
- cathode construction document status
- document for QA/soldering/cleaning cathodes
- document for QA/stuffing/cleaning cathode daughter boards
4. Miscellaneous
- LV, HV, signal cable update
- shield/braid questions
- cooling system test report
- HV connections to packages
- sense and field wire test document
- testing of production wire order
- remaining FDC system design work
- FDC construction clean room location update
5. Prototype tests
- update on cosmic ray stand
- small-scale prototype resolution study update
- test plan for full-scale prototype
**********************************************************************
**********************************************************************
* *