[Date Prev][Date Next][Thread Prev][Thread Next][Date Index][Thread Index]
Detector Integration Hall D Jun 11
Agenda Topics for Meeting on Detector Integration
=================================================
I would like to have somebody from each subsystem attempt to address the
following issues. Please send me a name for each subsystem who can begin
discussion on each topics and rough estimate of time required. I will send
out a tentative agenda in the next few days.
How each detector will be
- assembled
- installed
- maintained
- located (surveyed into place)
- supported
(can calorimeters be used for mechanical support?)
Requirements
- space allocation
- utilities (gas, power, controls,.. )
- cabling
- support structure
Interface issues to other detectors
- related to installation, maintenance, space, etc.
Detector Subsystems:
- Solenoid
- Target
- Barrel calorimeter
- Cylindrical drift chamber
- Forward drift chamber
- Vertex detector
- Cerenkov counter
- Time-of-flight system
- Forward calorimeter
Cheers, Elton.
--
Elton Smith
Jefferson Lab
elton@jlab.org
(757) 269-7625