Re: New Hall D Task List
Hi Tim,
Thanks. I added a link from the wiki under EHS&Q for reference.
Elton Smith
Jefferson Lab MS 12H5
12000 Jefferson Ave
Suite # 16
Newport News, VA 23606
elton@jlab.org
(757) 269-7625
(757) 269-6331 fax
On Mon, 10 Mar 2008, Tim Whitlatch wrote:
>
> Hello all,
>
> The accelerator has been using a system for quite a few years that
> captures all the work done in the accelerator and applicable areas. It
> is called ATList. It is web based and serves many functions. It helps in
> planning work safely, contains a task hazard analysis worksheet, informs
> the applicable people, helps coordinate the flow of work in the area,
> documents the work and provides a place for feedback. Halls A, B and C
> have recently adopted this and Hall D will use it also. This is usually
> reserved for physical tasks. The accelerator computer folks have kindly
> "cloned" the system so we can use it in Hall D. The system is called
> HDlist and can be accessed through clicking on the link below (sample
> task). I have put in a sample task. You can start looking at this and
> making comments immediately. The fields will change as we discover what
> is best for our hall. Use your regular JLAB login to access. If you are
> interested in learning more, you can contact me.This will eventually be
> tied into the Hall D elog when it is available.
>
> Cheers,
>
> Tim
> Sample task - FDC installation
> <http://devweb.acc.jlab.org/CSUEApps/hdlist/atlis.php?load=Task&task_id=136>
>
> Hazard Identification Worksheet
> NO Are there MSDS requirements for the materials being used with which
> you are unfamilar. or does the task require Personal Protective
> Equipment (PPE)?
> NO Will you create dust, welding arcs, heat, excessive noise,
> ionizing/non-ionizing radiation, or chemical mixtures during the tasks?
> NO Are there any fire or explosive hazards associated with the task or
> likely to develop because of the task?
> *YES* Could the task create headaches, breathing problems, or dizziness
> from odors, etc.?
>
> /Argon/Co2 while connecting gas lines if not done in a well ventilated
> area/
> *YES* Is the task performed where limited entry, egress, or poor
> ventilation exists?
>
> /Person must actually get in BCAL which is a confined area. Need to
> evaluate area and egress and work accordingly/
> *YES* Does the task require compressed, liquefied, or noxious gases?
>
> /Compressed gases to be stored outside hall/
> NO Does the task require work in areas or with materials subject to
> temperature extremes?
> *YES* Does the task involve the use of fork trucks, hoists, or cranes?
>
> /Need to crane the FDC assy onto platform. Need to have lift plan and
> follow ESH&Q manual chapter 6140. Crane operators must be trained and
> current./
> NO Does the task involve the use of powered hand tools?
> *YES* Does the work involve the risk of electrical shock or other forms
> of hazardous energy?
>
> /Ensure all electronics are powered off before connecting/
> *YES* Does the task involve working above or below floor level?
>
> /Work on platform. Rails are installs./
> *YES* Does the task involve lifting, pulling, pushing, or carrying
> heavy objects, or repetitive motion?
>
> /Use proper techniques when pulling FDC into BCAL. Evaluate the use of
> an electric winch./
> *YES* Does the task involve work with pressurized or vacuum vessels?
>
> /FDC is slightly pressurerized but does not pose an explosion hazard
> since pressure cannt get hignh enough/
> NO Does the task require any permits?
> *YES* Does the task require specialized training?
>
> /Each portion of the task will be performed by trained technicians
> (crane, electronics, gas system)/
> *YES* Will waste products require special handling or disposal
> requirements?
>
> /Exhaust gas will be vented to the outside/
> NO Any other hazards we may have overlooked with this list?
>
>
> Description of Task
>
> This is only a sample task! Bring FDC from EEL builing to Hall D.
> Install the FDC into the BCAL. This will involve craning the FDC onto
> the upstream platform, installing cables, sliding it into the BCAL,
> hooking up gas lines and cooling lines.
>
>
> Impact Statement
>
> The FDC must be installed before the CDC
>
>
> Hardware or Software Changes Required
>
> N/A
>
>
> Special Hazards/Safety Considerations
>
> The solenoid magnet must not be energized during this work.
>
>
> Special Checkout Instructions
>
> N/A
>
>
> Backout Procedure
>
> If there are problems, the FDC can be removed and a rework plan
> submitted.
> Status
> Task ID: 136
> Task Status: NEW
> Time Estimate: 10 Days
> Required PSS: NA
> Priority: Whenever
> Scheduled: 07/27/12
> Created: 03/10/08
> Last Modified: 03/10/08
> Created By: T_Whitlatch (x.5087)
> Owned By: T_Whitlatch (x.5087)
> Responsible: Tim Whitlatch
> Project:
>
> Systems
>
> * INSTALL
> * ALIGNMENT
> * EH
> * DC PWR
>
> Areas
>
> * ENCLOSURE: Hall D
> * Upstream Platform
> * BUILDINGS: EEL
>
>