[Date Prev][Date Next][Thread Prev][Thread Next][Date Index][Thread Index]

Re: Tagger design



Hello Tim,

Thanks for posting drawing. I will check geometry and go through
the simulation during next week.

Cheers,
       Sascha




On Fri, 26 Sep 2008, Tim Whitlatch wrote:

> Hello all,
>
>  As we had discussed during yesterdays meeting, I have posted some
> drawings showing the critical dimensions and interfaces for the magnet,
> hodoscope, microscope and vacuum chamber. I know some of these do not
> match what is currently being used in the software. I took a stab at the
> magnet dimensions with the increased step in the poles for the vacuum
> chamber walls. I have posted the drawings in order to get feedback and
> consensus on the required numbers. Please review them and add return
> comments to the email list. In order to have a reasonable set of
> consistent drawings for the Tagger review, these need to be nailed down
> within a week.  If I missed anything or misrepresented anything, please
> let me know. The drawings are on the wiki at;
>
> http://www.jlab.org/Hall-D/software/wiki/index.php/Tagged_Beam_Group_Engineering_Drawings
>
> The last 2 links under the Tagging spectrometer with the Sept. 26, 2008
> date.
>
> Cheers,
>
>        Tim
>
>
>