Next FDC meeting





Folks,

The agenda for this week's FDC (and joint FDC/CDC) meeting is
included below.  The time for the combined FDC/CDC meeting has
been expanded somewhat to allow sufficient time for discussion.
The regular FDC meeting will begin at 1:45 p.m..  Dialing 
instructions for outside folks are given below as well.  Let me
know if you have any questions.


				Regards,

				   Daniel

******************************************************************
FDC Weekly Meeting Agenda
Feb. 7, 2008
-----------------------------

1:00 - 1:45 p.m. : Combined FDC/CDC Meeting

1. Status of the tracking Monte Carlo with varying resolutions
2. Where we stand on the CDC.
3. Where we stand on the FDC.
4. Where we stand on electronics for chambers.
5. Cable routing for FDCs and impact on CDC design.

1:45 - 2:45 p.m. : FDC Meeting

1. Wire winding contract status and timeline.
2. Composite cathode prototype construction update.
3. Gas volume definition and new gas windows -- update of design.
    - impedance/flow calculations and para-solid model.
    - definitions of holes in cathodes, foam, and ground planes.
    - sketch of modifications to ground plane attachment skim.
    - can holes in boards be made by board house?
    - gas ports.
4. Cathode board discussion.
    - contact with board house : flatness specs and handling requirements
    - minimum copper thickness
    - aluminum strips
5. STB/HVTB design update.
    - procurement plans and number of sets to order.
    - stage 1 board stuffing.
    - document for board stuffing and procedures for cleaning.
    - modifications to construction jig for component clearance.
6. Plans for cathode flatness measurements.
    - specification document.
    - contacts with outside companies.
    - plans.
7. +/-75 deg. cathode mounting update
    - plans for installation into small-scale prototype.
8. Cathode daughter board update.
    - final design status.
    - machining of cathode rings.
    - thickness of Rohacell core on cathode frames.
9. FDC construction space request.
10. FDC insertion plans and cable layout.
11. Rail design for both FDC insertion options.
12. Mini-review update.
13. Full-scale prototype procurement plans.
    - available money in R&D budget.
    - list of items needed (with costs) for detector.
    - review of frame/spacer mass-production time lines.
14. Design of LV/HV systems for FDC.
15. Meeting with Mitch Newcomer.
16. Planning for March DC review.
    - Weekly Monte Carlo meetings

***********************************************************************

For outside folks, the dialing instructions are as follows:

# Call "The Conference Group" at 1-877-643-6951
# Enter a non-verbal pass code, followed by the # sign. 
  The passcode is 79627828
# When prompted, record your name, followed by the # sign. 
 
You will then be connected to the call as a "participant". If you call in
before the "leader" is connected you will hear music until he or she calls
in.

For calls from Canada, the phone number is 1-877-722-6536.

For other international calls, the phone number is 1-302-607-2017.

The passcode is the same for all calls. All calls are toll free for
participants.
**********************************************************************

**********************************************************************
*                                                                    *
* Dr. Daniel S. Carman                   e-mail : carman@jlab.org    *  
* Staff Scientist                        office : (757)-269-5586     *
* Jefferson Laboratory                   web: www.jlab.org/~carman   *  
*                                                                    *
**********************************************************************