Next FDC meeting (Note time change!!)
Folks,
The next FDC group meeting will be on Thursday at 2:15 p.m. in F227.
Note the meeting start time is 45 minutes later than usual! The
agenda for the meetings is included below.
Regards,
Daniel
**********************************************************************
FDC Weekly Meeting Agenda
May 29, 2008
-----------------------------
1. Full-scale prototype update.
- update on progress in preparing the cathode board PR
- Update on review of final design
- adding holes for gas/frame modifications
- 10th cathode daughter board
- Draft of PR
- Update on 5 micron board material
- How many board sets should be ordered?
- How to deal with edge definitions?
- clean room update
- status of procurement for granite tables
- status of procurement for second construction station
- short terms plans for wire frame construction
- soldering of HV capacitors
- modifications to construction jig for component clearance
- start of wire frame construction
- procurement updates
- second Lucite box
- transport/storage box
2. Wire winding planning.
- progress update from IUCF
- Phase 1 report
- next steps and planning for Phase 2 winding
3. Composite cathode prototype construction update.
- flatness measurement update
- future upgrades to 2-D automated scanning system
- flipped measurements of cathode board
- measurements of tensioned cathode
- issues with single ground connection
4. Design modification: clearance for rigid flex assemblies.
5. Gas volume definition.
- inclusion of gas windows in CAD model (Chuck)
6. Cathode board discussion. (Roger)
- soldering tests
- document for QA/stuffing/cleaning cathodes
- document for QA/stuffing/cleaning cathode daughter boards
7. STB/HVTB update. (Kim)
- document/instruction for board stuffing
8. Small-scale prototype test update.
- comments on Fernando's characterization document
- progress on defining specs for ASICs
- plans/timeline for preparing ASIC test writeup
- optical measurement of 2 micron cathode edge
9. Wire quality document.
10. Frame construction procedure document review.
11. Design of gas handling system.
**********************************************************************
**********************************************************************
* *