[Date Prev][Date Next][Thread Prev][Thread Next][Date Index][Thread Index]
Next FDC Group Meeting
Folks,
Our next FDC group meeting is scheduled for tomorrow afternoon at
1:30 p.m. in F326. The agenda is given below.
Regards,
Daniel
**********************************************************************
FDC Weekly Meeting Agenda
August 14, 2008
-----------------------------
1. Full-scale prototype update.
- FDC prototype readiness review planning & assignments
- JLab machine shop:
- test frame modification submission
- submission of wire frame work list
- modifications to construction jig
- status of second construction station
- wire frame construction:
- plans for new load test
- HV testing of all circuit boards
- A frame loan agreement
- removal of HVTB capacitors
- cathode update:
- prototype board delivery update
- plans for handling cathode boards
- QA test plan and clean room preparations
- procurements:
- rigid flex assemblies
- order for sense and field wire
- need for wire specification document
- cable orders (LV, signal)
- R&D schedule for cathodes
- spacer frame
- machining tests for CH2 sample
- radial size of spacer ring
- update on cutting cathode edges
- cooling system test report
2. Wire winding planning.
- update from IUCF on Phase 1 winding
3. Composite cathode prototype construction.
- flatness measurement system:
- update on procurements and machining
- time line
- work on joining cathode boards
- ground connections to cathode
- ground plane attachment status
- construction procedure document/outline
- cathode tension:
- in situ measurements
- required cathode tension calculations
4. Cathode board discussion.
- document for QA/stuffing/cleaning cathodes
- document for QA/stuffing/cleaning cathode daughter boards
5. STB/HVTB update.
- plans for moving STB capacitors radially inward (D=1020 mm)
- document/instruction for board stuffing
6. Small-scale prototype test update.
- ASIC studies writeup
- update on x/y plots with 2 um cathodes and pulser calibrations.
- new board resolution issues due to 6 mm pitch.
7. Design of gas handling system.
**********************************************************************
**********************************************************************
* *
* Dr. Daniel S. Carman e-mail : carman@jlab.org *
* Staff Scientist office : (757)-269-5586 *
* Jefferson Laboratory web: www.jlab.org/~carman *
* *
**********************************************************************