[Date Prev][Date Next][Thread Prev][Thread Next][Date Index][Thread Index]

Next FDC Group Meeting





Folks,

I did not include the agenda.  Try this again.  Group meeting
tomorrow at 1:30 p.m. in F326.  Agenda below.

					Daniel

*********************************************************************
FDC Weekly Meeting Agenda
September 11, 2008
-----------------------------
1. Full-scale prototype update.
    - clean room update
    - procurements:
       - plans for rigid flex assembly order
       - order for sense and field wire
          - wire specification document
       - Update on FDC prototype spreadsheet
    - spacer frame
       - material selection
       - prototype construction
    - cooling system test report
    - HV connections to packages
2. Wire frame update.
    - update from IUCF (+ teleconference)
    - wire frame construction:
       - wire frame load test update
       - construction procedure document
       - readiness for frame construction
       - A frame loan agreement
       - submission of wire frame work list
    - work to move STB caps radially inward
    - document/instruction for board stuffing + cleaning
3. Cathode construction update.
    - cathode update:
       - plans for handling cathode boards
       - SEM study of sample board
       - schedule for delivery of boards
    - flatness measurement system:
       - update on assembly
       - schedule for Micah
    - hole cutting procedures (when and how)
    - update on cutting cathode edges
    - ground connections to cathode
    - ground plane attachment status
    - construction procedure document/outline
    - cathode tension:
	- in situ measurements
    - R&D schedule for cathodes
    - document for QA/stuffing/cleaning cathodes
    - document for QA/stuffing/cleaning cathode daughter boards
4. Small-scale prototype test update.
    - ASIC studies writeup
    - update on x/y plots with 2 um cathodes and pulser calibrations.
    - resolution measurements
5. Design of gas handling system.
6. Preparations for collaboration meeting
7. Preparing DOE report on wire winding
**********************************************************************
**********************************************************************
*                                                                    *
* Dr. Daniel S. Carman                   e-mail : carman@jlab.org    *
* Staff Scientist                        office : (757)-269-5586     *
* Jefferson Laboratory                   web: www.jlab.org/~carman   *
*                                                                    *
**********************************************************************