Next FDC Group meeting
Folks,
Our next FDC group meeting is scheduled for tomorrow in F326.
NOTE: THE MEETING WILL START AT 2:15 P.M. INSTEAD OF OUR USUAL TIME!.
O.K., enough capital letters. The agenda for the meeting is given
below.
Regards,
Daniel
**********************************************************************
FDC Weekly Meeting Agenda
October 16, 2008
-----------------------------
1. Full-scale prototype update.
- procurements:
- plans for rigid-flex assembly order
- order for sense and field wire
- feedback on wire specification document
- PR for ordering Rohacell (110IG)
- PR for G10 sheets
- update on FDC prototype spreadsheet
- component storage and databasing
- spacer frame
- material selection (CH2, polypropylene, Noryl, Nylon-xx)
- prototype spacer construction
- cooling system test report
- HV connections to packages
2. Wire frame update.
- preparations for Phase 2
- status of paperwork
- delivery of transport box to JLab
- wire frame construction:
- laminate construction
- tolerance specs
- update on prototype work
- thickness measurements
- PCB annulus lamination update + measurements
- next steps
- when will construction start?
- construction procedure document
- remaining shop work for frames
- check of modified PCBs
- design work to move STB caps radially inward
- document/instruction for board stuffing + cleaning
3. Cathode construction update.
- cathode update:
- status of gas flow for boards in box
- SEM study of sample board
- cathode R&D work
- construction procedure document/outline
- in situ tension measurements
- finalize tension setting
- measure cathode distortions in two directions
- finalize glue strip design (non-silicon materials)
- flatness measurement system:
- update basic checkout of system
- measurement of granite table surface flatness
- flatness measurements of cathode prototypes
- update on cutting cathode edges
- ground connections to cathode
- ground plane attachment status
- R&D schedule for cathodes
- document for QA/stuffing/cleaning cathodes
- document for QA/stuffing/cleaning cathode daughter boards
4. Small-scale prototype test update.
- ASIC studies writeup
- update on x/y plots with 2 um cathodes and pulser calibrations.
- resolution measurements
**********************************************************************
**********************************************************************
* *