[Date Prev][Date Next][Thread Prev][Thread Next][Date Index][Thread Index]
Next FDC meeting
Folks,
The next FDC meeting is scheduled for tomorrow at 1:30 p.m. in F326.
The agenda for the meeting is given below. If you are responsible
for FDC-related work and will not be at the meeting, please let me
know today. Then send me an update report on progress.
Regards,
Daniel
**********************************************************************
FDC Weekly Meeting Agenda
November 13, 2008
-----------------------------
1. Full-scale prototype update.
- procurements:
- rigid-flex assemblies
- status of design and order
- status of field wire order
- delivery estimate
- status of Rohacell order
- status of G10 order
- update on FDC prototype spreadsheet
- component storage and databasing
- spacer frame
- material selection (CH2, polypropylene)
- prototype spacer construction
- cooling system test report
- HV connections to packages
2. Wire frame update.
- wire frame construction:
- update on prototype work
- work to control the epoxy during lamination
- show and tell
- construction procedure document updates
- specification/tolerance document
- document/instruction for board stuffing + cleaning
3. Cathode construction update.
- R&D schedule for cathodes
- weekly status updates
- cathode update:
- status of gas flow for boards in box
- SEM study of sample board
- cathode R&D work
- construction procedure document/outline
- in situ tension measurements
- finalize tension setting
- measure cathode distortions in two directions
- finalize glue strip design (non-silicon materials)
- flatness measurement system:
- update basic checkout of system
- measurement of granite table surface flatness
- flatness measurements of cathode prototypes
- update on cutting cathode edges
- ground connections to cathode
- ground plane attachment status
- document for QA/stuffing/cleaning cathodes
- document for QA/stuffing/cleaning cathode daughter boards
4. Small-scale prototype test update.
- ASIC submission timeline
- update on x/y plots with 2 um cathodes and pulser calibrations.
- resolution measurements
**********************************************************************
**********************************************************************
* *
* Dr. Daniel S. Carman e-mail : carman@jlab.org *
* Staff Scientist office : (757)-269-5586 *
* Jefferson Laboratory web: www.jlab.org/~carman *
* *
**********************************************************************