[Date Prev][Date Next][Thread Prev][Thread Next][Date Index][Thread Index]
GAS-1 ASICS arrived at Penn
Hall D Electronics:
The order of 32 open cavity packages and 8 die from the TSMC process has
arrived.
DVM measurements confirm expected connections, so bonding looks OK.
The test socket should be fully wired by tomorrow afternoon and we have
drawn up the list of initial tests:
DC
Power Draw by section
Input voltage/offsets
Output voltage/offsets
Pulse performance
Shape/Gain/ Dynamic range by channel
etc.
Hope to report initial findings by Friday.
Mitch