[Date Prev][Date Next][Thread Prev][Thread Next][Date Index][Thread Index]

Re: installation review



Fine with me Friday  morning....
Tim

Elke-Caroline Aschenauer wrote:
On Tue, 10 Feb 2009, George Biallas wrote:

Dear George and Elton,

I'm totally fine not to have any prebrief material on the magnet.
So lets just decide this.

George your outline for the talk is perfect, do you think you could be
ready for friday morning to have a dry run.

Actually do we think we could do all the dry runs on friday morning, like
8:00 - 11:00. I will have to go to the seminar at 11:00 if it happens and
have a meeting at 13:30 - 15:00, so we could also have one talk after
3:00pm.

cheers elke





  
Date: Tue, 10 Feb 2009 14:03:10 -0500
From: George Biallas <biallas@jlab.org>
To: Elton Smith <elton@jlab.org>
Cc: Elke-Caroline Aschenauer <elke@jlab.org>, HallD-ME@jlab.org
Subject: Re: installation review

Folks,
I was thinking about a more simple presentation:
1. What the magnet is - the reviewers are potentially not familiar
2. the sequence of putting it in the hall and commissioning it
2.1 this includes manpower to accomplish the tasks
3. The the present status of the magnet.
4. The plans to get the magnet into shape so that we have confidence
in it and it can be installed as above.


On Feb 10, 2009, at 1:41 PM, Elton Smith wrote:

    
HI Elke,

See below


On Mon, 9 Feb 2009, Elke-Caroline Aschenauer wrote:

      
Dear all,

I have prepared a review www page for the installation review @
18th of
february.

Please go to the section labled Pre Brief Material.

I have linked the drawings Tim or ? please have look I have always
the
latest and best vertsion. I used for al lthe drawings despite the
tagger
and beam line the ones from the CD3 drawing package.

I have started to link schedules, not all are there yet. Please
give me
some feedback on what is the plan on the individual ones. and place
the
latest versions in M:\halld\Individual-Schedules in the respective
directory so I can make pdf files out of them.

Do we have anythink  on the magnet we coudl give as prebrief
material.
        
George's report to the Hall D meeting is at
http://www.jlab.org/~elke/SolenoidForceReview_20081203.ppt
Unfortunately, it is not an overview of the whole magnet. George could
suggest the most recent overview which is relatively up-to-date. I'm
not
sure we should place something on the pre-brief that will raise more
questions than it answers.

      
Now Elton you had some ideas about infor on grounding and so on,
which
document/talk did you have in mind.

        
I think we had in mind the information something like the presentation
that Fernando gave at the systems review:
http://www.jlab.org/Hall-D/reviews/System_Review_May08/Final_Talks/W7-HallD%20System%20&%20Infrastructure%20Review-1.ppt

For pre-brief material, one could use the GlueX-docs 1029 and
1035. See other links at
http://www.jlab.org/Hall-D/software/wiki/index.php/Electronics#Electronics_Subsystems


Cheers, Elton.

      
Anything else which is missing.

thanks elke

( `,_' )+=-+=-+=-+=-+=-+=-+=-+=-+=-+=-+=-+=-+=-+=-+=-+=-+=
 )    `\                                                  -
/    '. |                                                  +
|       `,              Elke-Caroline Aschenauer            =
 \,_  `-/                                                    -
 ,&&&&&V         Jefferson Lab                                +
,&&&&&&&&:       HALL-D 12C / F381       121-A Atlantic Avenue =
,&&&&&&&&&&;      Suite 8                 Hampton, VA 23664      -
|  |&&&&&&&;\     12000 Jefferson Ave                             +
|  |       :_) _  Newport News, VA 23606  Tel.:  001-757-224-1216  =
|  |       ;--' | Mail:  elke@jlab.org    Mobil: 001-757-256-5224   -
'--'   `-.--.
|                                                    +
  \_    |  |---' Tel.:
001-757-269-5352                             =
    `-._\__/     Fax.:
001-757-269-6331                              -
           +=-+=-+=-+=-+=-+=-+=-+=-+=-+=-+=-+=-+=-+=-+=-+=-+=-+=-+=-
+=-+

        
George H. Biallas P.E.
Suite 402
Jefferson Lab
12050 Jefferson Ave.
Newport News VA 23606
Work: 757 269 7535,
Page: 757 584 7535
Cell: 757 813 1179
Home: 757 877 1267



    
 ( `,_' )+=-+=-+=-+=-+=-+=-+=-+=-+=-+=-+=-+=-+=-+=-+=-+=-+=
  )    `\                                                  -
 /    '. |                                                  +
 |       `,              Elke-Caroline Aschenauer            =
  \,_  `-/                                                    -
  ,&&&&&V         Jefferson Lab                                +
 ,&&&&&&&&:       HALL-D 12C / F381       121-A Atlantic Avenue =
,&&&&&&&&&&;      Suite 8                 Hampton, VA 23664      -
|  |&&&&&&&;\     12000 Jefferson Ave                             +
|  |       :_) _  Newport News, VA 23606  Tel.:  001-757-224-1216  =
|  |       ;--' | Mail:  elke@jlab.org    Mobil: 001-757-256-5224   -
'--'   `-.--.   |                                                    +
   \_    |  |---' Tel.:  001-757-269-5352                             =
     `-._\__/     Fax.:  001-757-269-6331                              -
            +=-+=-+=-+=-+=-+=-+=-+=-+=-+=-+=-+=-+=-+=-+=-+=-+=-+=-+=-+=-+