[Date Prev][Date Next][Thread Prev][Thread Next][Date Index][Thread Index]
cable order
It seems that we have both been talking to Mike about the cable purchase
but, you may have missed some emails while you were out of town. The
consensus is that we will strip the outer jacket and shield from the
standard pvc cable over the last 2 meters and then heat shrink over the
foil shield for that distance. This gives us the minimum possible mass
in the bore while maintaining the maximum shielding and durability over
the rest of the length. I was in process for ordering but, I will
default to you if you desire. We shouldn't duplicate effort.
Thanks
Joe