[Date Prev][Date Next][Thread Prev][Thread Next][Date Index][Thread Index]
Next FDC group meeting
Folks,
Our next FDC group meeting is scheduled for tomorrow afternoon at
1:30 p.m.. The planned agenda is below. Please bring pictures/details
for the items that you are responsible for.
Regards,
Daniel
********************************************************************
FDC Weekly Meeting Agenda
Jan. 31, 2008
-----------------------------
1. Composite wire frame status.
2. Wire winding contract status and timeline.
3. Composite cathode prototype construction update.
4. Gas volume definition and new gas windows -- update of design.
- impedance calculations and definitions of holes in cathodes,
foam, and ground planes.
- gas ports.
5. Cooling system update and block diagram.
6. STB/HVTB design update.
- procurement plans and number of sets to order.
7. Plans for cathode flatness measurements.
- acceptable measurement schemes and tolerances.
8. +/-75 deg. cathode mounting update
- plans for installation into small-scale prototype.
9. Cathode daughter board update.
- final design status.
10. FDC cable routing update.
- plans for insertion from upstream end.
- space requirements outside of CDC.
- plans to be able to pull FDC out downstream for servicing/siting.
11. Mini-review update.
12. Full-scale prototype procurement plans.
- available money in R&D budget.
- list of items needed (with costs) for detector.
- review of frame/spacer mass-production time lines.
13. Design of LV/HV systems for FDC.
14. Next joint FDC/CDC meeting and agenda.
If anyone from the outside would like to participate let me know
beforehand so that we can set up the conference call.
**********************************************************************
* *
* Dr. Daniel S. Carman e-mail : carman@jlab.org *
* Staff Scientist office : (757)-269-5586 *
* Jefferson Laboratory web: www.jlab.org/~carman *
* *
**********************************************************************