[Date Prev][Date Next][Thread Prev][Thread Next][Date Index][Thread Index]
Next FDC Group Meeting
Folks,
Our next FDC group meeting is scheduled for tomorrow at 1:30 p.m.
in F228. The agenda is below.
Regards,
Daniel
**********************************************************************
FDC Weekly Meeting Agenda
Feb. 21, 2008
-----------------------------
1. Full-scale prototype update.
- available money in R&D budget
- procurement plans
- keeping track of budget
2. Wire winding planning.
- current news
- verification of wire quality (SEM scans)
3. Composite cathode prototype construction update.
- Vibration issues
- Addition of support pillar
4. Ground connection scheme.
- Wire frame boards
- Cathode planes
- Ground planes
5. Gas volume definition.
- impedance/flow calculations and para-solid model
- definitions of holes in cathodes and foam.
- can holes in boards be made by board house?
- gas ports and mechanical prototype.
- finalize thickness of ground planes.
6. Cathode board discussion.
- contact with board house:
- flatness specs and handling requirements
- pre-made holes in cathode boards
- cathode laser surgery results
- minimum copper thickness
- thoughts on aluminum strips
- ground/ground pour definitions
- modifications to avoid current loop
- QA procedures for boards at board house and upon delivery
7. Cathode daughter board update.
- final design status
- plans to reduce number of LV lines per cathode frame
- thickness of Rohacell core on cathode frames
- Daughter board stuffing at JLab
8. STB/HVTB design update.
- procurement plans and number of sets to order
- document for board stuffing and procedures for cleaning
- modifications to construction jig for component clearance
- visit with Greg Arnold
- specification of ground connectors
9. Plans for cathode flatness measurements.
- Document describing costs associated with developing system at JLab
- Discussions with JLab machine shop about our plans and schedule
10. +/-75 deg. cathodes.
- status of mounting
- plans for installation into small-scale prototype
11. Cooling system test update and planning.
12. FDC insertion plans and cable layout.
- ideas for rail system design and FDC attachment hardware
- discussion of plans for insertion scheme
- impacts of rail system on design and defined rail keep-out zones
- Radial size of cable bundle
- Cable run design to allow for extraction of FDC
- Design of CDC shell for FDC cable support
13. Discussion of mini-review report.
14. Design of LV/HV systems for FDC.
15. Design of gas handling system.
16. Planning for March DC review.
- Weekly Monte Carlo meetings
- Document preparation
- Schedule
**********************************************************************
**********************************************************************
* *
* Dr. Daniel S. Carman e-mail : carman@jlab.org *
* Staff Scientist office : (757)-269-5586 *
* Jefferson Laboratory web: www.jlab.org/~carman *
* *
**********************************************************************