[Date Prev][Date Next][Thread Prev][Thread Next][Date Index][Thread Index]

Re: review



Dear all,

this email is not to push but to help us to keep an overview what we need
still Wednesday for the prebrief material.

1. Document to motivate everything.
   -- the benefit of PID performance I guess goes in this document.
2. document on the cdc
3. document on the fdc
4. document on BCAL and forward TOF
5. document on the tracking
6. documents on the electronics
   -- 100MHZ FADC
   -- F1 TDC
   -- ASIC

I would appreciate to receive things as early as conveniently possible, so
there is a chance to have a look to things and see things are consistent.

cheers and thanks
elke




> Date: Fri, 7 Mar 2008 07:31:54 -0500 (EST)
> From: Elke-Caroline Aschenauer <elke@jlab.org>
> To: halld-tracking-hw@jlab.org, halld-pid@jlab.org,
>      Eugene Chudakov <gen@jlab.org>
> Subject: review
>
> Hall D PID Mail List:
>
>
> Dear all,
>
> I know that lately things are a " bit " busy, but we have our drift
> chamber & PID review coming up.
>
> I was wondering we should not use the opportunity that a lot of us are at
> one place and meet today either after the last discussion session or
> tomorrow after the Closeout.
>
> There have been quite some pre-brief material been posted on the portal
>
> 990-v4 	The GlueX Central Drift Chamber
> 754-v5 	Forward Drift Chamber Technical Design Report
> 994-v1 	TOF detector description for CDR
>
> and Alex posted a nice summary on kinematics
> 838-v3 	A Summary of Kinematics Relevant to the GlueX Experiment
>
> I think it would be a good idea if the FDC group would scrutinize the CDC
> documents and visa versa.
>
> On the electronics there is also already a lot
> 967-v3 	High Voltage Distribution for the Hall D CDC and FDC Detectors
> 966-v2 	Low Voltage Distribution for the Hall D CDC and FDC Detectors
> 855-v2 	Specification Document for FDC/CDC ADC
> 995-v2 	Cable Characteristics for the Hall D FDC and CDC Detectors
> we have of course also documents on the F1TDC.
> I think what is missing is a summary on the ASIC, but I'm sure Mitch and
> Fernando are working on it.
>
> For the tracking Dave started to write something.
> Dave how far are we to have a consistent set of plots on tracking using
> only the new geometry.
> I really think we should show only plots from one geometry, everything
> else is slightly confusing.
>
> Additional info: 992-v2 	Start Counter Update
>
> The one worry I have is what we have on the overall PID performance of the
> detector. I think we really have to concentrate on this the next 2 weeks.
>
> Just as a courtesy reminder, the absolute latest the pre-brief material has
> to go out is Friday the 21st noon.
>
> Most what I listed can be found from.
> http://www.jlab.org/Hall-D/software/wiki/index.php/DC_and_PID_Review
>
> Cheers elke
>
>  ( `,_' )+=-+=-+=-+=-+=-+=-+=-+=-+=-+=-+=-+=-+=-+=-+=-+=-+=
>   )    `\                                                  -
>  /    '. |                                                  +
>  |       `,              Elke-Caroline Aschenauer            =
>   \,_  `-/                                                    -
>   ,&&&&&V         Jefferson Lab                                +
>  ,&&&&&&&&:       HALL-D 12C / F381       121-A Atlantic Avenue =
> ,&&&&&&&&&&;      Suite 8                 Hampton, VA 23664      -
> |  |&&&&&&&;\     12000 Jefferson Ave                             +
> |  |       :_) _  Newport News, VA 23606  Tel.:  001-757-224-1216  =
> |  |       ;--' | Mail:  elke@jlab.org    Mobil: 001-757-256-5224   -
> '--'   `-.--.   |                                                    +
>    \_    |  |---' Tel.:  001-757-269-5352                             =
>      `-._\__/     Fax.:  001-757-269-6331                              -
>             +=-+=-+=-+=-+=-+=-+=-+=-+=-+=-+=-+=-+=-+=-+=-+=-+=-+=-+=-+=-+
>

 ( `,_' )+=-+=-+=-+=-+=-+=-+=-+=-+=-+=-+=-+=-+=-+=-+=-+=-+=
  )    `\                                                  -
 /    '. |                                                  +
 |       `,              Elke-Caroline Aschenauer            =
  \,_  `-/                                                    -
  ,&&&&&V         Jefferson Lab                                +
 ,&&&&&&&&:       HALL-D 12C / F381       121-A Atlantic Avenue =
,&&&&&&&&&&;      Suite 8                 Hampton, VA 23664      -
|  |&&&&&&&;\     12000 Jefferson Ave                             +
|  |       :_) _  Newport News, VA 23606  Tel.:  001-757-224-1216  =
|  |       ;--' | Mail:  elke@jlab.org    Mobil: 001-757-256-5224   -
'--'   `-.--.   |                                                    +
   \_    |  |---' Tel.:  001-757-269-5352                             =
     `-._\__/     Fax.:  001-757-269-6331                              -
            +=-+=-+=-+=-+=-+=-+=-+=-+=-+=-+=-+=-+=-+=-+=-+=-+=-+=-+=-+=-+