[Date Prev][Date Next][Thread Prev][Thread Next][Date Index][Thread Index]

Re: review



On Sat, 15 Mar 2008, Elke-Caroline Aschenauer wrote:

Dear all,

as usual I have prepared a www-page for the reviewers to find all the
information for the review.

http://www.jlab.org/Hall-D/guest_secure/Tracking_PID_REVIEW_Mar08/
the login and password is the same as for the other reviews, like the
calorimeter one.

Under PreBrief you will find

# Physics, Tracking and PID Performance Metrics

# Reconstruction algorithm and results

# Central Drift Chamber        available
# Forward Drift Chamber        available

# Forward Time-of-Flight       available
# Barrel Calorimeter and its time-of-flight for MIPs (section 2.3.3)     available

# Technical Drawings           some available
# Electronics                  some available

# Additional Material          everything available

    * Summary on the whole detector project in Hall D
    * Start Counter
    * COST and SCHEDULE
    * FDC technology review 1st of Feb. 2008
    * Link to other Hall D reviews


I would really like to send apart from the overview document and the
tracking one the rest out today.
So I would highly appreciate to get the remaining ones for Electronics and
the technical drawings.

I think it is a must to give the material a week in advance everybody who
has been a reviewer knows how much work it is to go through so much
material.

thanks elke




> Date: Sat, 15 Mar 2008 17:39:28 -0400 (EDT)
> From: Elke-Caroline Aschenauer <elke@jlab.org>
> To: halld-tracking-hw@jlab.org, halld-pid@jlab.org,
>      Eugene Chudakov <gen@jlab.org>, HallD-ME@jlab.org
> Subject: Re: review
>
> Hall D PID Mail List:
>
> Dear all,
>
> this email is not to push but to help us to keep an overview what we need
> still Wednesday for the prebrief material.
>
> 1. Document to motivate everything.
> 2. document on the cdc
> 3. document on the fdc
> 4. document on BCAL ToF
> 5. document on forward TOF
> 5. document on the tracking
> 6. documents on the electronics
> 7. technical drawings
>
> I would appreciate to receive things as early as conveniently possible, so
> there is a chance to have a look to things and see things are consistent.
>
> cheers and thanks
> elke
>
>
>
>
> > Date: Fri, 7 Mar 2008 07:31:54 -0500 (EST)
> > From: Elke-Caroline Aschenauer <elke@jlab.org>
> > To: halld-tracking-hw@jlab.org, halld-pid@jlab.org,
> >      Eugene Chudakov <gen@jlab.org>
> > Subject: review
> >
> > Hall D PID Mail List:
> >
> >
> > Dear all,
> >
> > I know that lately things are a " bit " busy, but we have our drift
> > chamber & PID review coming up.
> >
> > I was wondering we should not use the opportunity that a lot of us are at
> > one place and meet today either after the last discussion session or
> > tomorrow after the Closeout.
> >
> > There have been quite some pre-brief material been posted on the portal
> >
> > 990-v4 	The GlueX Central Drift Chamber
> > 754-v5 	Forward Drift Chamber Technical Design Report
> > 994-v1 	TOF detector description for CDR
> >
> > and Alex posted a nice summary on kinematics
> > 838-v3 	A Summary of Kinematics Relevant to the GlueX Experiment
> >
> > I think it would be a good idea if the FDC group would scrutinize the CDC
> > documents and visa versa.
> >
> > On the electronics there is also already a lot
> > 967-v3 	High Voltage Distribution for the Hall D CDC and FDC Detectors
> > 966-v2 	Low Voltage Distribution for the Hall D CDC and FDC Detectors
> > 855-v2 	Specification Document for FDC/CDC ADC
> > 995-v2 	Cable Characteristics for the Hall D FDC and CDC Detectors
> > we have of course also documents on the F1TDC.
> > I think what is missing is a summary on the ASIC, but I'm sure Mitch and
> > Fernando are working on it.
> >
> > For the tracking Dave started to write something.
> > Dave how far are we to have a consistent set of plots on tracking using
> > only the new geometry.
> > I really think we should show only plots from one geometry, everything
> > else is slightly confusing.
> >
> > Additional info: 992-v2 	Start Counter Update
> >
> > The one worry I have is what we have on the overall PID performance of the
> > detector. I think we really have to concentrate on this the next 2 weeks.
> >
> > Just as a courtesy reminder, the absolute latest the pre-brief material has
> > to go out is Friday the 21st noon.
> >
> > Most what I listed can be found from.
> > http://www.jlab.org/Hall-D/software/wiki/index.php/DC_and_PID_Review
> >
> > Cheers elke
> >
> >  ( `,_' )+=-+=-+=-+=-+=-+=-+=-+=-+=-+=-+=-+=-+=-+=-+=-+=-+=
> >   )    `\                                                  -
> >  /    '. |                                                  +
> >  |       `,              Elke-Caroline Aschenauer            =
> >   \,_  `-/                                                    -
> >   ,&&&&&V         Jefferson Lab                                +
> >  ,&&&&&&&&:       HALL-D 12C / F381       121-A Atlantic Avenue =
> > ,&&&&&&&&&&;      Suite 8                 Hampton, VA 23664      -
> > |  |&&&&&&&;\     12000 Jefferson Ave                             +
> > |  |       :_) _  Newport News, VA 23606  Tel.:  001-757-224-1216  =
> > |  |       ;--' | Mail:  elke@jlab.org    Mobil: 001-757-256-5224   -
> > '--'   `-.--.   |                                                    +
> >    \_    |  |---' Tel.:  001-757-269-5352                             =
> >      `-._\__/     Fax.:  001-757-269-6331                              -
> >             +=-+=-+=-+=-+=-+=-+=-+=-+=-+=-+=-+=-+=-+=-+=-+=-+=-+=-+=-+=-+
> >
>
>  ( `,_' )+=-+=-+=-+=-+=-+=-+=-+=-+=-+=-+=-+=-+=-+=-+=-+=-+=
>   )    `\                                                  -
>  /    '. |                                                  +
>  |       `,              Elke-Caroline Aschenauer            =
>   \,_  `-/                                                    -
>   ,&&&&&V         Jefferson Lab                                +
>  ,&&&&&&&&:       HALL-D 12C / F381       121-A Atlantic Avenue =
> ,&&&&&&&&&&;      Suite 8                 Hampton, VA 23664      -
> |  |&&&&&&&;\     12000 Jefferson Ave                             +
> |  |       :_) _  Newport News, VA 23606  Tel.:  001-757-224-1216  =
> |  |       ;--' | Mail:  elke@jlab.org    Mobil: 001-757-256-5224   -
> '--'   `-.--.   |                                                    +
>    \_    |  |---' Tel.:  001-757-269-5352                             =
>      `-._\__/     Fax.:  001-757-269-6331                              -
>             +=-+=-+=-+=-+=-+=-+=-+=-+=-+=-+=-+=-+=-+=-+=-+=-+=-+=-+=-+=-+
>

 ( `,_' )+=-+=-+=-+=-+=-+=-+=-+=-+=-+=-+=-+=-+=-+=-+=-+=-+=
  )    `\                                                  -
 /    '. |                                                  +
 |       `,              Elke-Caroline Aschenauer            =
  \,_  `-/                                                    -
  ,&&&&&V         Jefferson Lab                                +
 ,&&&&&&&&:       HALL-D 12C / F381       121-A Atlantic Avenue =
,&&&&&&&&&&;      Suite 8                 Hampton, VA 23664      -
|  |&&&&&&&;\     12000 Jefferson Ave                             +
|  |       :_) _  Newport News, VA 23606  Tel.:  001-757-224-1216  =
|  |       ;--' | Mail:  elke@jlab.org    Mobil: 001-757-256-5224   -
'--'   `-.--.   |                                                    +
   \_    |  |---' Tel.:  001-757-269-5352                             =
     `-._\__/     Fax.:  001-757-269-6331                              -
            +=-+=-+=-+=-+=-+=-+=-+=-+=-+=-+=-+=-+=-+=-+=-+=-+=-+=-+=-+=-+