Next FDC Group meeting





Folks,

Our next FDC group meeting is scheduled for tomorrow at 1:30 p.m.
in F326.  The agenda is given below.


				Regards,

					Daniel

**********************************************************************
FDC Weekly Meeting Agenda
October 1, 2008
-----------------------------
1. Full-scale prototype update.
    - procurements:
       - plans for rigid-flex assembly order
       - order for sense and field wire
          - wire specification document
       - solder station
       - schedule for preparing PR for remaining cathodes
       - update on FDC prototype spreadsheet
       - component storage
    - spacer frame
       - material selection (CH2, polypropylene, Noryl, Nylon-xx)
       - prototype spacer construction
    - cooling system test report
    - HV connections to packages
    - clean room update
2. Wire frame update.
    - preparations for Phase 2
       - status of paperwork
       - delivery of transport box to JLab
    - wire frame construction:
       - problems with laminate construction
          - update on prototype work
	  - thickness measurements
	  - next steps
	  - order for Rohacell and G10
       - construction procedure document
       - A-frame loan agreement
       - remaining shop work for frames
    - design work to move STB caps radially inward
    - document/instruction for board stuffing + cleaning
3. Cathode construction update.
    - cathode update:
       - gas flow for boards??
       - SEM study of sample board
    - flatness measurement system:
       - update on assembly
       - basic checkout of system
       - flatness measurements
    - hole cutting procedures
       - cathode hole punch tests and plans
    - update on cutting cathode edges
    - ground connections to cathode
    - ground plane attachment status
    - construction procedure document/outline
    - cathode tension:
	- in situ measurements
    - R&D schedule for cathodes
    - document for QA/stuffing/cleaning cathodes
    - document for QA/stuffing/cleaning cathode daughter boards
4. Small-scale prototype test update.
    - ASIC studies writeup
    - update on x/y plots with 2 um cathodes and pulser calibrations.
    - resolution measurements
5. Design of gas handling system.
6. Signed drawings??
**********************************************************************
**********************************************************************
*                                                                    *
* Dr. Daniel S. Carman                   e-mail : carman@jlab.org    *
* Staff Scientist                        office : (757)-269-5586     *
* Jefferson Laboratory                   web: www.jlab.org/~carman   *
*                                                                    *
**********************************************************************