Next FDC Group meeting





Folks,

Our next FDC group meeting is scheduled for tomorrow at 1:30 p.m.
in F326.  The agenda is given below.


				Regards,

					Daniel

**********************************************************************
FDC Weekly Meeting Agenda
September 25, 2008
-----------------------------
1. Summary of Collaboration meeting.
2. DOE report on wire winding.
3. Full-scale prototype update.
    - procurements:
       - plans for rigid-flex assembly order
       - order for sense and field wire
          - wire specification document
       - solder station
       - schedule for preparing PR for remaining cathodes
       - update on FDC prototype spreadsheet
       - component storage
    - spacer frame
       - material selection (CH2, polypropylene, Noryl, Nylon-xx)
       - prototype spacer construction
    - cooling system test report
    - HV connections to packages
    - clean room update
4. Wire frame update.
    - preparations for Phase 2
       - statement of work preparation
    - wire frame construction:
       - wire frame load test results
       - STB and HVTB work
          - changing resistors
	  - drilling through-holes
       - construction procedure document
       - frame construction work, problems, & schedule
       - A-frame loan agreement
       - remaining shop work for frames
    - design work to move STB caps radially inward
    - document/instruction for board stuffing + cleaning
5. Cathode construction update.
    - cathode update:
       - first cathode shipment
       - electrical QA testing
       - plan for handling cathode boards
       - SEM study of sample board
       - modifications to storage case
    - flatness measurement system:
       - update on assembly
       - schedule for Micah
    - hole cutting procedures (when and how)
       - cathode hole punch tests and plans
    - update on cutting cathode edges
    - ground connections to cathode
    - ground plane attachment status
    - construction procedure document/outline
    - cathode tension:
	- in situ measurements
    - R&D schedule for cathodes
    - document for QA/stuffing/cleaning cathodes
    - document for QA/stuffing/cleaning cathode daughter boards
6. Small-scale prototype test update.
    - ASIC studies writeup
    - update on x/y plots with 2 um cathodes and pulser calibrations.
    - resolution measurements
7. Design of gas handling system.
8. Signed drawings??
**********************************************************************
**********************************************************************
*                                                                    *
* Dr. Daniel S. Carman                   e-mail : carman@jlab.org    *
* Staff Scientist                        office : (757)-269-5586     *
* Jefferson Laboratory                   web: www.jlab.org/~carman   *
*                                                                    *
**********************************************************************