Hi Richard,
After going through these items with Slava and Chuck, we have the
following comments/questions;
1. Yes, the 10 inch tube extends 12" into the cave. Since the vacuum
picks up just downstream of the 2nd collimator, what type of thin
window is required is required at both locations?
2. On the 3D model from Igor, the primary collimator has (3) 5cm
tungsten sections (15cm total). Should there be 6 of these?
3. We will show 2cm pole gap for now
4/5. We can put a 2cm square hole. Can it be round?
6. Again, the secondary collimator shows (5) 5cm nickel sections (25 cm
total). Should there be 10?
7. The inner dimensions of the cave are 452 cm wide by 269.24 cm
high.This can vary as much as 3 cm. Currently there are no provisions
for a notch in the concrete on the civil drawings. This would require a
modification to the design. We will have to detail out that design and
submit to facilities.
The facility drawings are available on the M drive. If you cannot
access them, I can send .pdf of pertinent sheets.
M:\planteng\12_GeV\Design\Hall_D_Design\Final_Design\Draft_Final_Submittal\Dwgs
Thanks,
Tim
Tim Whitlatch wrote:
Hi Richard et al,
Thank you for the feedback. We will look this over and correct the
model and produce new top and side views. We will also add the
materials.
Cheers,
Tim
Elke-Caroline Aschenauer wrote:
On Wed, 21 May 2008, Elton Smith wrote:
Actually I think we need a side and a top view to have all dimensions
available easily. As we want to check this drawin than vs the Monte Carlo.
cheers elke
Date: Wed, 21 May 2008 10:16:11 -0400 (EDT)
From: Elton Smith <elton@jlab.org>
To: Richard Jones <richard.t.jones@uconn.edu>
Cc: Tim Whitlatch <whitey@jlab.org>,
Hall D beam working group <halld-tagger@jlab.org>
Subject: Re: Collimator layout
HI Tim,
On the drawing it would also be very useful to show the materials in each
of the blocks. (Fe, concrete, Pb, etc).
Thanks, Elton.
Elton Smith
Jefferson Lab MS 12H5
12000 Jefferson Ave
Suite # 16
Newport News, VA 23606
elton@jlab.org
(757) 269-7625
(757) 269-6331 fax
On Wed, 21 May 2008, Richard Jones wrote:
Tim,
Here are some comments on the collimator cave layout views you sent me.
1. The vacuum pipe that carries the photon beam from the tagger hall to the
collimator cave is shown as 5cm in diameter. The civil plans show a stainless
steel pipe 10 inches in diameter connecting the two halls. The simplest plan
would simply be to evacuate the entire 10 inch pipe (only rough vacuum is
required) in which case the pipe that enters the cave area should have a diameter
of 25.4cm.
2. The primary collimator should be 30cm long. In the drawing it looks like only
15cm.
3. The pole gap in the first sweep magnet is nominally 2cm. This is not shown, and
is subject to change as we refine the specs on the sweeps.
4. The hole through the 200cm iron shielding block is shown at 1cm dimensions. It
should be a 2cm x 2cm square hole.
5. The hole through the 100cm x 200cm x 200cm concrete shielding block is shown at
1cm dimensions. It should be a 2cm x 2cm square hole.
6. The secondary collimator is shown as 25cm long, or so. The length in my geometry
is 50cm, with a circular bore hole diameter of 5mm.
7. The inner dimensions of the cave area in my description were 270cm high x 450cm
wide. The lead wall separating the cave from the main hall area was designed
with dimensions 470cm x 270cm to completely cover the opening in the vertical
direction (270cm) and to go 10cm past the left and right inner wall dimensions.
This could be accomplished by a notch in the side walls at the entrance to the
cave.
Richard Jones
1. Tim Whitlatch wrote:
Hi Richard,
Slava has dimensioned the collimator layout as supplied in Igor's Autocad
file. There are many dimensions for the shielding sizes as well as the
beamline locations. Please look this over and let me know if this is what
is needed as far as locations and size. There is a top and side view .pdf
attached.
Thanks,
Tim
( `,_' )+=-+=-+=-+=-+=-+=-+=-+=-+=-+=-+=-+=-+=-+=-+=-+=-+=
) `\ -
/ '. | +
| `, Elke-Caroline Aschenauer =
\,_ `-/ -
,&&&&&V Jefferson Lab +
,&&&&&&&&: HALL-D 12C / F381 121-A Atlantic Avenue =
,&&&&&&&&&&; Suite 8 Hampton, VA 23664 -
| |&&&&&&&;\ 12000 Jefferson Ave +
| | :_) _ Newport News, VA 23606 Tel.: 001-757-224-1216 =
| | ;--' | Mail: elke@jlab.org Mobil: 001-757-256-5224 -
'--' `-.--. | +
\_ | |---' Tel.: 001-757-269-5352 =
`-._\__/ Fax.: 001-757-269-6331 -
+=-+=-+=-+=-+=-+=-+=-+=-+=-+=-+=-+=-+=-+=-+=-+=-+=-+=-+=-+=-+
|